ENERGY SERVICES
ALBERTA
How multiple medium-voltage and fiber-optic cables were installed to carry power and data across a 48-turbine wind energy development.
Project
Wind Farm
Time Span
2022
Service Components
Medium-Voltage Cable Installation
Fiber-Optic Cable Installation
ROHL was brought in to complete the wind farm’s multi-cable installation over a short period of on-site work. The goal was to coordinate the installation across the site while keeping pace with the broader construction schedule.

Location:
Dunmore, AB
Terrain:
Sand and Gravel
Access:
Rural
Installing nearly 24 km of power cable, fiber-optic cable, and grounding conductor in a single pass required accuracy. Each run had precise stopping points from splice and junction boxes, and turbine centre pins, leaving little room for measurement or placement errors.
Heavy cable reels added complexity, while existing infrastructure and wet ground conditions affected how crews could work across the site. With multiple trades operating at the same time, access and sequencing also had to be carefully coordinated to maintain progress.
01
Precise Cable Placement
02
Heavy Material Handling
03
Wet Site Conditions
04
Multi-Trade Coordination
ROHL used cable plowing rather than conventional open-trench methods to install the cables and conductor in a single pass. This approach reduces installation time, cost, and ground disturbance.
Where we were unable to direct plow, crews completed 15 horizontal directional drilling bore pulls to navigate crossings without disturbance. Pulling cable directly from the reels through each minimized the need for splicing. Every run was planned against engineered drawings and utility locates, while daily meetings with other trades kept schedules and work coordinated.
01
Single-Pass Cable Plowing
02
15 HDD Bore Pulls
03
Minimal Splicing
04
Coordinated Installation
THE IMPACT
Our cable-plowing approach made it possible to complete the installation between August and October, a schedule that conventional trenching could not have achieved.
Installing multiple cables in a single pass reduced installation time and cost while limiting disturbance to the surrounding land.
WIND TURBINES
KM MV cable plowed
TIMELINE
01
July 2022
Project quote submitted
02
August 2022
The project contract is confirmed
03
Aug-Oct, 2022
Crews mobilized and carried out the cable installation
04
Oct 2022
Installation scope was completed